Request Callback
Projects
Case Studies
Llys Awelon Retirement Housing : Steplift
Pollock Lifts was approached early in the project directly by READ Construction who had previously seen one of our Classic StepLifts at one of their
August 28, 2024
Case Studies
Bradford: Adjacent Entry 2m Steplift
Client Requirements The client is a young woman with severe arthritis, who is finding it increasingly difficult to manage steps and has a prognosis of
August 1, 2024
Case Studies
Marine Grade 2 Metre Steplift for Docklands Waterfront – Durable & Reliable Lifting Solution
To have lifts that work well and blend in with their surroundings, bespoke lifts are crucial for getting over architectural barriers. Client Requirement: Our client
July 29, 2024
Case Studies
Sunnyside Apartments Belfast – E10
Customer Requirements Customer required a lift that would fit the needs of this limited space. This small block of apartments in Belfast was limited with
August 12, 2020
Case Studies
St Catherine’s College Armagh – A7000 Platform Lift
Customer Requirements This customer had specific needs that required a bespoke design created by Pollock Lifts. St Catherine’s College Armagh required the use of a
August 12, 2020
Case Studies
Newtownhamilton High School – A5000 Platform Lift
Customer Requirements The customer required a bespoke lift located outside of the premises, for accessibility reasons to classrooms down a set of steps, a concrete
August 12, 2020